Advanced Distributed Simulation Technology II (ADST-II) Extended Air Defense Testbed Final Report.
Abstract
The Extended Air Defense Testbed (EADTB) Delivery Order (DO) was conducted under the Site Activation Process described in the Systems Engineering Management Plan (SEMP) and Delivery Order Management Process section of the ADST II Operational Description Plan. This site activation effort was for the Fort Bliss, TX, EADTB facility. The technical period of performance was from June 17 to November 20, 1997. The effort was performed as DO #0046 under the Lockheed Martin Advanced Distributed Simulation Technology II (ADST II) Contract administered by the U.S. Army Simulation, Training, and Instrumentation Command (STRICOM). The purpose of this final report is to document the ADST II effort which supported the site activation effort for the EADTB. This report includes a full description of the integration effort, its conditions, and lessons learned.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 19, 1997
- Accession Number
- ADA344679
Entities
Organizations
- Lockheed Martin