Implementing Joint Vision 2010: Identifying GATM as a Basic Need

Abstract

Joint Vision 2010 illustrates a yellow brick road to future warfighting capability that is built on a solid foundation of strategic mobility. At the same time, the global airspace structure is undergoing a fundamental change that will severely limit the United States Armed Forces' ability to carry out the types of air mobility operations Joint Vision 2010 describes. So, it is incumbent upon the individual services to follow that plan with a bona fide purple acquisition process for all programs required to pave the road. Only in this way can the Department of Defense truly ensure fully capable air mobility operations such that combatant commanders can deter aggression and, if necessary, wage and win war in support of United States national security objectives.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1998
Accession Number
ADA354285

Entities

People

  • William B. Gautier

Organizations

  • Air Force Institute of Technology

Tags

Communities of Interest

  • Air Platforms
  • Human Systems
  • Materials and Manufacturing Processes
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Air Force
  • Air Mobility Operations
  • Collision Avoidance
  • Department Of Defense
  • Inertial Navigation
  • Inertial Navigation Systems
  • Military Science
  • National Security
  • Navigation
  • Personnel Management
  • Procurement
  • Students
  • Tanker Aircraft
  • Tilt Rotor Aircraft
  • United States
  • Warfare

Readers

  • Aerospace Engineering
  • Military History of the United States in the 20th Century.
  • Strategic Security Studies

Technology Areas

  • Space