Time and Resources Required for Postmobilization Training of AC/ARNG Integrated Heavy Divisions,

Abstract

This report contains the results of analysis by RAND's Arroyo Center on the postmobilization training process for integrated divisions composed of elements of the Army National Guard (ARNG) and the Active Component (AC). As part of an effort to redesign ARNG divisions, the Secretary of the Army directed a study of a proposal to form two integrated divisions, each constructed by merging three ARNG enhanced separate brigades with an Active Component division headquarters. The U.S. Army Training and Doctrine Command (TRADOC) was given the task of developing the concept and assessing its viability. The analysis presented in this report is part of that assessment. The material presented here was previously delivered as an executive-level annotated briefing to the Commanding Generals of U.S. Army Forces Command (FORSCOM) and TRADOC.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1998
Accession Number
ADA357577

Entities

People

  • James C. Crowley
  • Jerry M. Sollinger
  • Thomas F. Lippiatt

Organizations

  • RAND Corporation

Tags

Communities of Interest

  • C4I
  • Human Systems

DTIC Thesaurus Topics

  • Administrative Personnel
  • Air Defense
  • Artillery
  • Combat Forces
  • Combat Operations
  • Combat Support
  • Command And Control
  • Department Of Defense
  • Doctrine
  • Employment
  • Engineers
  • Enlisted Personnel
  • Management Personnel
  • Multiple Launch Rocket System
  • Personnel Management
  • Task Forces
  • Warfare

Readers

  • Business Analytics
  • Maritime Combat Support and Expeditionary Logistics.
  • Naval Personnel Management