Design of a Switched-Reluctance Motor Drive for Electric Propulsion

Abstract

This First Annual Report summarizes the activities performed on this grant from August 1, 1998, until April 30, 1999. Detailed technical reports will be written once that a specific topic or task has been completed. We were informed by late March 1998 that the Office of Naval Research decided to fund our grant with a starting date of May 1, 1998. We assembled the research team by August 1998 since we were able to hire all graduate students by the fall 1998 semester. Graduate students normally start their graduate studies in the fall semester (that normally begins around mid August) or in the spring semester (that normally begins around mid January). Also, it normally takes 2 to 3 months to find graduate students qualified for a specific research project. We are expecting to speed up our efforts so we can finish this research project by its ending date (i.e., April 30, 2001). The remainder of this report addresses the assembled research team, the main activities performed during the period covered by this report, the activities in progress, and the expenses incurred from August 1, 1998, to May 15, 1999.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1999
Accession Number
ADA363184

Entities

People

  • Juan Carlos
  • Terry W. Martin

Organizations

  • University of Arkansas

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Circuits
  • Closed Loop Systems
  • Computer-Aided Design
  • Control Systems
  • Converters
  • Electric Motors
  • Electric Propulsion
  • Electric Vehicles
  • Electrical Engineering
  • Engineering
  • Motors
  • Power Converters
  • Power Electronics
  • Simulations
  • Students
  • Topology
  • Voltage Source Inverters

Readers

  • Clinical Trial Research.
  • Naval Personnel Management
  • Technical Research and Report Writing.