Advanced Distributed Simulation Technology II (ADST II) Extended Air Defense Testbed (EADTB).
Abstract
The Extended Air Defense Testbed (EADTB) Delivery Order (DO) was conducted under the Site Activation Process described in the Systems Engineering Management Plan (SEMP) and Delivery Order Management Process section of the ADST 2 Operational Description Plan. This site activation effort was for the Fort Bliss, TX EADTB facility. The technical period of performance was from June 17, 1997 to November 20, 1997. This contract was administered by the U.S. Army Simulation, Training, and Instrumentation Command (STRICOM).
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1999
- Accession Number
- ADA363420
Entities
People
- John C. Lindgren