Design Requirements for Capping
Abstract
This technical note describes design requirements and is design sequence for Level Bottom Capping (LBC) and Contained Aquatic Disposal (CAD) projects. The procedures and sequence include evaluation of capping and contaminated sediments, site selection, equipment and placement techniques, mixing and dispersion during placement, required capping sediment thickness, material spread and mounding during placement, cap stability, and monitoring.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1991
- Accession Number
- ADA365526