Site Selection Considerations for Capping
Abstract
This technical note describes site selection considerations for projects involving the capping of contaminated dredged material. General considerations in site selection and special consideration of bathymetry, currents, water depth, and operation characteristics are included.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1991
- Accession Number
- ADA365586