Site Selection Considerations for Capping

Abstract

This technical note describes site selection considerations for projects involving the capping of contaminated dredged material. General considerations in site selection and special consideration of bathymetry, currents, water depth, and operation characteristics are included.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1991
Accession Number
ADA365586

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Army
  • Army Corps Of Engineers
  • Bathymetry
  • Civil Engineering
  • Coastal Engineering
  • Deep Water
  • Dredging
  • Engineering
  • Engineers
  • Environment
  • Environmental Protection
  • Materials
  • Open Water
  • Site Selection
  • Sites
  • Water
  • Waterways

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering