DEFENSE ACQUISITIONS: Comanche Program Cost, Schedule, and Performance Status.

Abstract

The Comanche's restructured program contains significant risks' of cost overruns, schedule delays, and degraded performance because it would (1) begin file engineering and manufacturing development phase before some key mission equipment technologies have matured and have been integrated into the flight-test aircraft; (2) compress the flight-test schedule, increasing file amount of concurrent developmental and operational testing; and (3) begin initial production before initial operational testing starts, resulting in concurrency between development testing and initial production. The program is proceeding to the next development phase with high levels of uncertainty Successful commercial firms generally do

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1999
Accession Number
ADA368029

Entities

Organizations

  • United States Government Accountability Office

Tags

Communities of Interest

  • Air Platforms
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Accounting
  • Acquisition
  • Aircrafts
  • Airframes
  • Army Aviation
  • Budgets
  • Cost Analysis
  • Cost Estimates
  • Department Of Defense
  • Economic Analysis
  • Manufacturing
  • Military Acquisition
  • National Security
  • Product Development
  • Radar
  • Test And Evaluation
  • Utility Aircraft

Readers

  • Aviation Science / Aeronautics.
  • Defense Acquisition Program Management
  • Software Engineering