Defense Base Realignment and Closure Budget Data for Naval Hospital Bremerton, Washington.

Abstract

The overall audit objective was to determine the accuracy of Defense BRAC military construction budget data. The specific objectives were to determine whether the proposed project was based on valid BRAC requirements, the decision for military construction was supported with required documentation including an economic analysis, and the economic analysis considered existing facilities. We did not assess the adequacy of the management control program as part of this audit because it will be discussed in a summary report on FY 1998 Defense BRAC military construction budget data.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 19, 1997
Accession Number
ADA369179

Entities

People

  • Douglas L. Jones
  • Mary J. Gibson
  • Michael A. Joseph
  • Shelton R. Young
  • Timothy J. Tonkovic

Organizations

  • Office of the Inspector General, U.S. Department of Defense

Tags

Communities of Interest

  • Biomedical
  • Human Systems

DTIC Thesaurus Topics

  • Active Duty
  • Aircraft Carriers
  • Base Closures
  • Budgets
  • Cancellation
  • Cost Estimates
  • Department Of Defense
  • Economic Analysis
  • Health Care
  • Health Services
  • Hospitals
  • National Security
  • Naval Air Stations
  • Naval Shore Facilities
  • Navy
  • Personnel Management
  • Puget Sound

Readers

  • Instructional Design and Training Evaluation.
  • Political Science/ International Relations/ European Studies
  • Speech Processing/Speech Recognition.