Defense Base alignment and Closure Budget Data for the Construction of Family Housing at Naval Air Station Fallon, Nevada

Abstract

The overall audit objective was to determine the accuracy of BRAC MILCON budget data. The specific objectives were to determine whether the proposed project was a valid BRAC requirement, whether the decision for MILCON was supported with required documentation including an economic analysis, and whether the economic analysis considered existing facilities. The audit also assessed the adequacy of the management control program as it applied to the overall audit objective. The management control program objective will be discussed in a summary report of FY 1997 BRAC MILCON budget data.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 22, 1996
Accession Number
ADA370671

Entities

Organizations

  • Office of the Inspector General, U.S. Department of Defense

Tags

Communities of Interest

  • Biomedical
  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Base Closures
  • Budgets
  • California
  • Cost Estimates
  • Department Of Defense
  • Economic Analysis
  • Enlisted Personnel
  • Families (Human)
  • Financial Management
  • Military Families
  • Military Personnel
  • National Security
  • Naval Air Stations
  • Personnel Management
  • Training

Readers

  • Aerospace Test and Evaluation
  • Computational Modeling and Simulation
  • Public Financial Management and Budgeting