Defense Base Realignment and Closure Budget Data for the Realignment of Grissom Air Reserve Base, Indiana
Abstract
The overall audit objective was to determine the accuracy of Defense base realignment and closure military construction budget data. This report provides the results of the audit of three projects, valued at $2.48 million, for the realignment of Grissom Air Reserve Base, Indiana. The three projects were originally included in the FY 1995 Defense base realignment and closure military construction budget and were among the eight projects covered in a prior Inspector General, DoD, report on the realignment.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 06, 1996
- Accession Number
- ADA371031
Entities
Organizations
- Office of the Inspector General, U.S. Department of Defense