Defense Base Realignment and Closure Budget Data for the Construction of the Overwater Antenna Test Range Facility at Newport, Rhode Island

Abstract

The overall audit objective was to determine the accuracy of BRAC MILCON budget data. The specific objectives were to determine whether the proposed project was a valid BRAC requirement, whether the decision for MILCON was supported with required documentation including an economic analysis, and whether the economic analysis considered existing facilities. The audit also assessed the adequacy of the management control program as it applied to the overall audit objective. The management control program objective will be discussed in a summary report on FY 1997 BRAC MILCON budget data.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 26, 1996
Accession Number
ADA371054

Entities

Organizations

  • Office of the Inspector General, U.S. Department of Defense

Tags

Communities of Interest

  • Ground and Sea Platforms
  • Materials and Manufacturing Processes
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force
  • Base Closures
  • Budgets
  • Construction
  • Cost Estimates
  • Department Of Defense
  • Economic Analysis
  • Economic Security
  • Financial Management
  • National Security
  • Navy
  • Rhode Island
  • Security
  • Test Facilities
  • Undersea Warfare
  • United States
  • Warfare

Readers

  • Government Contracting/Procurement.
  • Industrial Economics