Technical Assistance To Supplement Installation of Low NOx Boilers at the Pentagon Heating and Refrigeration Plant.
Abstract
After new Low NO(x) boilers were installed at the Pentagon Heating and Refrigeration Plant (PHRP), the U.S. Army Construction Engineering Research Laboratory (CERL) was tasked by the Baltimore District Pentagon Renewal Office (PRO) to research several issues related to the installation and performance of the units. CERL assembled a team of engineers to conduct on-site testing and inspection to assess whether the installed system met the intent of "parallel metered combustion controls" to produce safe and stable low NO(x) combustion. The team made four site visits to investigate the adequacy and safety of the primary air and flue gas recirculation configuration with regard to combustion control, to address items of special interest to the PHRP, and to make recommendations to improve system performance.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1999
- Accession Number
- ADA371296
Entities
People
- A. H. Studebaker
- Charles M. Schmidt
- Chip Matheson
- Mark Coleman
- Michael K. Brewer
Organizations
- Construction Engineering Research Laboratory