Defense Information School at Fort George G. Meade Base Realignment and Closure Military Construction Project
Abstract
The overall objective was to determine the adequacy of budget data for Defense base realignment and closure military construction. The specific objectives were to determine whether the proposed projects were based on valid Defense base realignment and closure requirements; whether the decision for military construction was supported with required documentation, including an economic analysis; and whether the analysis considered existing facilities. This report provides the results of the audit of a facility construction project, estimated to cost $36 million, for the consolidation and realignment of the Defense Information School, Fort Benjamin Harrison; the Defense Visual Information School, Lowry Air Force Base; and the Defense Photography School, Naval Air Station, Pensacola, to Fort George G. Meade, Maryland, (Ft. Meade). This audit also assessed the adequacy of the management control program as it applied to the audit objectives.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 30, 1995
- Accession Number
- ADA372011
Entities
People
- C. J. Richardson
- Harrell D. Spoons
- Jenniffer Wilson
- Sharon D. Nguyen
- Thomas F. Gimble
Organizations
- Office of the Inspector General, U.S. Department of Defense