Defense Base Realignment and Closure Budget Data for the Realignment of the Inter-American Air Forces Academy.

Abstract

Public Law 102-190, "National Defense Authorization Act for Fiscal Years 1992 and 1993," December 5, 1991, directs the Secretary of Defense to ensure that the amount of the authorization that DoD requested for each military construction project associated with Defense base realignment and closure does not exceed the original estimated cost provided to the Commission on Defense Base Closure and Realignment (the Commission). If the requested budget amounts exceed the original project cost estimates provided to the Commission, the Secretary of Defense is required to explain to Congress the reasons for the differences. The Inspector General, DoD, is required to review each Defense base realignment and closure military construction project for which a significant difference exists from the original cost estimate and to provide the results of the review to the congressional Defense committees. This report is one in a series of reports about FY 1996 Defense base realignment and closure military construction costs.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 29, 1995
Accession Number
ADA372111

Entities

Organizations

  • Office of the Inspector General, U.S. Department of Defense

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Base Closures
  • Budgets
  • Cost Estimates
  • Department Of Defense
  • Economic Analysis
  • Economic Security
  • Financial Management
  • Military Training
  • National Security
  • Naval Air Stations
  • Navy
  • Students
  • Training
  • United States
  • Warfare

Readers

  • Defense Acquisition Program Management
  • Life Cycle Cost Analysis
  • Political Science/ International Relations/ European Studies