A. Report Title: Defense Base Realignment and Closure Budget Data for the Closure of Naval Reserve Readiness Center San Francisco, California, and Realignment to Naval and Marine Corps Reserve Center Alameda, California

Abstract

The overall audit objective was to determine the accuracy of Defense BRAC MILCON budget data. The specific objectives were to determine whether the proposed MILCON project was based on valid Defense BRAC requirements, whether the decision for MILCON was supported with required documentation including an economic analysis, and whether the analysis considered existing facilities. We also reviewed the management control program as it applied to the objectives.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 15, 1995
Accession Number
ADA372672

Entities

People

  • Arsenio M. Sebastian
  • Bobbie Sau Wan
  • Marc E. Avers
  • Paul J. Granetto
  • Terry L. Mckinney

Organizations

  • Office of the Inspector General, U.S. Department of Defense

Tags

Communities of Interest

  • Biomedical
  • Human Systems
  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Base Closures
  • Budgets
  • Cost Estimates
  • Department Of Defense
  • Economic Analysis
  • Economic Security
  • Engineering
  • Financial Management
  • Marine Corps
  • National Security
  • Naval Air Stations
  • Naval Shore Facilities
  • Navy
  • Security
  • United States

Readers

  • Defense Financial Management and Audit.
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.