DOD Resource Utilization Measurement System.

Abstract

In response to congressional direction, DoD proposed establishing a Resource Utilization Measurement System (RUMS) to report standardized workload information that would assess Major Range and Test Facility Base (test range) capacity and use. The Office of the Secretary of Defense reported to Congress that implementation of RUMS at all test ranges would be accomplished by the end of FY 1994 if the system was feasible and useful.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 09, 1995
Accession Number
ADA372687

Entities

Organizations

  • Office of the Inspector General, U.S. Department of Defense

Tags

Communities of Interest

  • Air Platforms
  • Weapons Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Aerial Warfare
  • Air Force
  • Air Force Facilities
  • Base Closures
  • Control Systems
  • Department Of Defense
  • Engineering
  • Field Tests
  • Governments
  • Instrumentation
  • Materials
  • National Security
  • Systems Engineering
  • Test And Evaluation
  • Test Facilities
  • Warfare

Readers

  • Aerospace Test and Evaluation
  • Defense Technology Research and Development.
  • Instructional Design and Training Evaluation.