Intrinsic Remediation Engineering Evaluation/Cost Analysis for the FT-OO2 Site Final Addendum II

Abstract

This report was prepared for the Air Force Center for Environmental Excellence (AFCEE) by Parsons Engineering Science, Inc. (Parsons ES) as a second addendum (Addendum II) to the Final Intrinsic Remediation Engineering Evaluation/Cost Analysis (EE/CA) (Parsons ES, 1995). The EE/CA was conducted to evaluate the use of natural attenuation with long-term monitoring (LTM) for remediation of fuel hydrocarbons dissolved in groundwater at site FT-002, Plattsburgh Air Force Base (AFB), New Y%rk. The report also provided an assessment of the concentration and distribution of chlorinated aliphatic hydrocarbons (CAHs) dissolved in groundwater.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1999
Accession Number
ADA372861

Entities

Organizations

  • Parsons Corporation

Tags

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Aliphatic Hydrocarbons
  • Alkenes
  • Chemical Synthesis
  • Chemistry
  • Cost Analysis
  • Electron Acceptors
  • Engineering
  • Environmental Protection
  • Groundwater
  • Hydrocarbons
  • Monitoring
  • New York
  • Organic Chemistry
  • Risk Management
  • Standards

Fields of Study

  • Environmental science

Readers

  • Environmental Remediation and Restoration.
  • Groundwater Contamination Remediation.