Spare and Repair Parts Affected by Design and Engineering Changes.
Abstract
The FY 1994 DoD budget included more than $3.6 billion for the modification of weapon systems and equipment in the Aircraft, Missile, Weapons, and the Weapons and Tracked Combat Vehicle Procurement Appropriations. With the reduction in new weapon systems acquisition, a primary means of fielding new technology and modernizing forces will be through the modification of existing front line equipment.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 16, 1994
- Accession Number
- ADA374092
Entities
Organizations
- Office of the Inspector General, U.S. Department of Defense