Defense Base Realignment and Closure Budget Data for the Closure of Marine Corps Air Station El Toro and Tustin, California, and the Realignment to Naval Air Station Miramar, California.

Abstract

Public Law 102-190, "National Defense Authorization Act for Fiscal Years 1992 and 1993," December 5, 1991, directs the Secretary of Defense to ensure that the amount of the authorization that DoD requested for each military construction project associated with base realignment and closure does not exceed the original estimated cost provided to the Commission on Defense Base Closure and Realignment (the Commission). If the requested budget amounts exceed the original project cost estimates provided to the Commission, the Secretary of Defense is required to explain to Congress the reasons for the differences. The Inspector General, DoD, is required to review each base realignment and closure military construction project for which a significant difference exists from the original cost estimate and to provide the results of the review to the congressional Defense committees. This report is one in a series of reports about FYs 1994 and 1995 Defense base realignment and closure military construction costs.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 25, 1994
Accession Number
ADA374313

Entities

Organizations

  • Office of the Inspector General, U.S. Department of Defense

Tags

Communities of Interest

  • Biomedical
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Aircrafts
  • Base Closures
  • Budget Estimates
  • Budgets
  • Cost Estimates
  • Department Of Defense
  • Economic Analysis
  • Engineering
  • Financial Management
  • Law
  • Marine Corps
  • National Security
  • Naval Air Stations
  • Naval Operations
  • Navy

Readers

  • Defense Acquisition Program Management
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.