Base Closure and Realignment Budget Data for the Naval Surface Warfare Center

Abstract

Introduction. The audit was directed by Public Law 102-190, "National Defense Authorization Act for Fiscal Years 1992 and 1993," December 5, 1991. The Public Law states that the Secretary of Defense shall ensure that the amount of the authorization requested by DoD for each military construction project associated with base realignment and closure actions does not exceed the original estimated cost provided to the Base Closure and Realignment Commission (the Commission). The Secretary of Defense is required to explain to Congress the reasons for the differences between the original project cost estimate provided to the Commission and the requested budget amount. The Inspector General, DoD, is required to review each military construction project for which a significant difference exists and to provide the results of the review to the congressional Defense committees. This report is one in a series of reports relating to FY 1994 military construction costs for realigning and closing bases.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 29, 1993
Accession Number
ADA376660

Entities

People

  • David K. Steensma
  • Frank W. Gulla
  • Nick Como
  • Riccardo R. Buglisi
  • Wayne K. Million

Organizations

  • Office of the Inspector General, U.S. Department of Defense

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Base Closures
  • Budget Estimates
  • Cost Estimates
  • Department Of Defense
  • Engineering
  • Financial Management
  • Gas Turbines
  • Law
  • National Security
  • Naval Shore Facilities
  • Naval Warfare
  • Navy
  • Shipbuilding
  • Surface Warfare
  • Systems Engineering

Readers

  • Public Financial Management and Budgeting