Engineering Considerations for Capping Subaqueous Dredged Material Deposits -- Background and Preliminary Planing
Abstract
The following two technical notes present information applicable to planning and constructing dredged material capping projects: EEDP-O1-3 Background and Preliminary Planning EEDP-O1-4 Design Concepts and Placement Techniques This first note identifies and reviews field experiences with subaqueous capping of dredged material and discusses aspects of site selection.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1987
- Accession Number
- ADA382420
Entities
People
- Clifford L. Truitt