Remedial Measures for Downstream Outlet Wall, Hopkinton Dam Merrimack River Basin, NH
Abstract
The right side (east) outlet wall which separates the forebay pool from the stilling basin has been displaying consistent movement since construction of the dam. Measurements taken have shown that the movement is a combination of both frost action and lateral loading due to earth pressure. This report describes the types of measurements taken, the results and conclusions drawn from those measurements, and a discussion of alternatives for correcting the problem.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1997
- Accession Number
- ADA382476
Entities
People
- Reginald Pretto
Organizations
- New England District, U.S. Army Corps of Engineers