Work Plan for an Engineering Evaluation/Cost Analysis for Hill Air Force Base, Ogden, Utah

Abstract

This work plan was prepared by Engineering-Science, Inc. (ES) and presents the scope of work required for the collection of data necessary to conduct an engineering evaluation/cost analysis (EB/CA) for remediation of fuel hydrocarbon-contaminated ground water at underground storage tank (UST) Site 870, Hill Air Force Base (AFB), Utah. Several remedial options will be evaluated during the EE/CA, including free product removal; ground water extraction, treatment, and reinjection (i.e., pump and treat); air sparging; and natural contaminant attenuation with long-term monitoring. All hydrogeologic and ground water chemical data necessary to evaluate the various remedial options will be collected under this program; however, this work plan is oriented toward the collection of hydrogeologic data to be used as input into the Bioplume II ground water model in support of the natural attenuation (intrinsic remediation) with long-term monitoring remedial option for restoration of fuel hydrocarbon-contaminated ground water.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1993
Accession Number
ADA384391

Entities

Organizations

  • Parsons Corporation

Tags

Communities of Interest

  • Biomedical
  • Human Systems

DTIC Thesaurus Topics

  • Alkenes
  • Chemical Synthesis
  • Chemistry
  • Environmental Protection
  • Groundwater
  • Organic Chemistry
  • Water Resources

Readers

  • Environmental Remediation and Restoration.