Part I: Bioventing Pilot Test Work Plan for Installation Restoration Program Sites 3 and 18. Fire Protection Training Area No. 1 (Site 3). Bulk Fuel Storage Area (Site 18), Beale Air Force Base, California. Part II: Draft Interim Pilot Test Results for Installation Restoration Program Sites 3 and 18. Fire Protection Training Area No. 1 (Site 3). Bulk Fuel Storage Area (Site 18), Beale Air Force Base, California

Abstract

This Pilot Test Work Plan presents the scope of two in situ bioventing pilot tests for treatment of fuel contaminated soils at Installation Restoration Program (IRP) Sites 3 and 18 at Beale AFB, California: Fire Protection Training Area (Site 3); and, Bulk Fuel Storage Area (Site 18). The location of all 24 IRP sites at Beale AFB, including Sites 3 and 18, are shown on Figure 1.1. These pilot tests have three primary objectives: 1) to assess the potential for supplying oxygen throughout the contaminated soil depth, 2) to determine the rate at which indigenous microorganisms will degrade fuel when stimulated by oxygen rich soil gas, and 3) to evaluate the potential for sustaining these rates of biodegradation until fuel contamination is remediated below regulatory standards.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1993
Accession Number
ADA384457

Tags

Communities of Interest

  • Energy and Power Technologies
  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Chemical Synthesis
  • Chemistry
  • Construction
  • Department Of Defense
  • Detectors
  • Engineering
  • Environmental Pollutants
  • Groundwater
  • Installation Restoration
  • Materials Laboratories
  • Materials Science
  • Materials Testing
  • Measurement
  • Storage Tanks
  • Test Methods

Fields of Study

  • Environmental science

Readers

  • Environmental Remediation and Restoration.