Interim Corrective Measures Work Plan for the Expanded Bioventing System Eglin Main Base Old Fire Training Area

Abstract

This interim corrective measures work plan (ICM work plan) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at the Eglin Main Base Old Fire Training Area (old Eglin FTA) at Eglin Air Force Base (AFB), Florida. This site is also identified as Installation Restoration Program (IRP) Site FT-28. The proposed expanded system activities will be performed by Parsons Engineering Science, Inc. (Parsons ES) formerly Engineering- Science, Inc. (ES) for the Air Force Center for Environmental Excellence (AFCEE) Technology Transfer Division (ERT) under Contract No. F41624-92-D-8036, Delivery Order No. 0017. The primary objectives of the bioventing system upgrade are to: (1) Provide aerobic in situ remediation of fuel-contaminated soils by injection of atmospheric air into soil; (2) Sustain aerobic in situ biodegradation to reduce the concentration of hydrocarbons in the soils within the unsaturated zone beneath the site; and (3) Provide additional site characterization data toward closure.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1997
Accession Number
ADA384513

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Air Force
  • Arachnid Bites And Stings
  • Chemical Synthesis
  • Chemistry
  • Environmental Protection
  • Groundwater
  • Health Services
  • Measurement
  • Medical Personnel
  • Personal Protective Equipment
  • Safety Equipment
  • Therapy
  • Wounds And Injuries

Fields of Study

  • Environmental science

Readers

  • Environmental Remediation and Restoration.