First Year of Full Scale Bioventing Operation
Abstract
This report presents the results of a full scale bioventing remediation work at the 7th Street BX Service Station in Eglin AFE, Florida. The report includes a summary of initial pilot test results, system start-up and system optimization, and results and analysis of in-situ respiration tests conducted to evaluate the effectiveness of the system during the first year of operation. In addition, a summary of the monthly operation and maintenance effort is also included.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1993
- Accession Number
- ADA384517