Operations and Maintenance Manual for the Full-Scale Bioventing System at POL Yard, Sites SS-06 and ST-40
Abstract
This Operations and Maintenance (O&M) Manual has been created as a guide for monitoring and maintaining the performance of the full-scale bioventing blower system and vent well plumbing at former Wurtsmith Air Force Base (AFB), Michigan. Record drawings of the full-scale bioventing system installed at Sites 55-06 and ST-40 have been provided to Wurtsmith Air Force Base Conversion Agency (AFBCA) personnel.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1996
- Accession Number
- ADA384657
Entities
Organizations
- Parsons Corporation