Operations and Maintenance Manual for Expanded Bioventing Systems Facilities 44625D and 44625E

Abstract

This letter transmits three copies of the Operation and Maintenance (O&M) Manual prepared for the expanded bioventing system recently installed at Facilities 44625D and 44625E, Cape Canaveral Air Station (AS), Florida. Appendix A of the O&M Manual contains record drawings for the installed system. This letter also provides a summary of the work performed by Parsons Engineering Science, Inc. (Parsons ES) at Facilities 44625D and 44625E from November 1996 through March 1997, and at Facility 1748 in November 1996, and presents initial bioventing system operating parameters and sampling results. Copies of this letter and the O&M Manual also have been sent to Mr. Ed Worth at Patrick Air Force Base (AFB). Mr. Worth is the current point of contact for extended bioventing activities at Cape Canaveral AS as well as Patrick AFB.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1997
Accession Number
ADA384849

Entities

Organizations

  • Parsons Corporation

Tags

Communities of Interest

  • Energy and Power Technologies
  • Human Systems

DTIC Thesaurus Topics

  • Air Filters
  • Air Flow
  • Air Force
  • Air Force Facilities
  • Department Of Defense
  • Engineering
  • Flow Rate
  • Groundwater
  • Hypervelocity Flow
  • Materials
  • Measurement
  • Monitoring
  • Power Equipment
  • Pressure Gages
  • Relief Valves
  • Stainless Steel
  • Standards

Readers

  • Aerospace Test and Evaluation
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Technical Research and Report Writing.