Remedial Action Plan for Expanded Bioventing System Buildings 2034/2035, Fairchild Air Force Base, Washington
Abstract
This remedial action plan (RAP) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils in the vicinity of Buildings 2034 and 2035 at Fairchild Air Force Base (AFB), Washington. The proposed expanded system activities will be performed by Parsons Engineering Science, Inc. (Parsons ES) for the Air Force Center for Environmental Excellence (AFCEE) Technology Transfer Division (ERT) under contract F4l624-92-D-8036, 0017. The primary objectives of the bioventing system upgrade are to: * Deliver oxygen to contaminated subsurface soil throughout affected portions of the site; * Provide additional characterization data for closure; * Continue aerobic in situ remediation of fuel-contaminated soils by injection of atmospheric air into soil; and * Sustain aerobic in situ biodegradation until hydrocarbon -contaminated soils within the unsaturated zone are remediated to below regulatory approved standards.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1996
- Accession Number
- ADA384913
Entities
Organizations
- Parsons Corporation