Operation and Maintenance Manual, Record Drawings, and Summary of Initial Results for the Expanded Bioventing System Installed at Site SS-41 (Former Fuel Pumping Station Number 3), Charleston AFB, SC
Abstract
This letter transmits three copies of the Operation and Maintenance (O&M) Manual prepared for the expanded bioventing system recently installed at Site SS-4l (Former Fuel Pumping Station No. 3, Building 93), Charleston Air Force Base (AFB), South Carolina. Appendix A of the O&M Manual contains record drawings for the installed system. This letter report also provides a summary of the work performed by Parsons Engineering Science, Inc. (Parsons ES) at the site from February through June 1997. Included in this report are the initial bioventing system operating parameters and sampling results. Copies of this letter and the O&M Manual also have been sent to Mr. Al Urrutia, the point of contact at Charleston AFB.
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 28, 1997
- Accession Number
- ADA385067
Entities
Organizations
- Parsons Corporation