Bioventing Test Work Plan for Building 97-Flightline Fuel Pump House, Charleston AFB, South Carolina

Abstract

Enclosed are two copies of the Draft Bioventing Work Plan for Building 97- Flightline Fuel Pump House, Charleston Air Force Base, South Carolina. This Draft report serves as a site-specific addendum to the document "Test Plan and Technical Protocol for a Field Treatability Test for Bioventing."

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1993
Accession Number
ADA385068

Tags

Communities of Interest

  • Biomedical
  • Energy and Power Technologies
  • Human Systems

DTIC Thesaurus Topics

  • Air Flow
  • Air Force
  • Air Force Facilities
  • Construction
  • Contamination
  • Contractors
  • Engineering
  • Environmental Pollutants
  • Excavation
  • Flow Rate
  • Fuel Pumps
  • Fuel Systems
  • Groundwater
  • Jet Engine Fuels
  • Liquid Phases
  • Phase
  • South Carolina

Readers

  • Environmental Remediation and Restoration.