Extended Bioventing Testing Results for Buildings 2034/2035, Fairchild AFB, Washington
Abstract
This letter presents the results of the bioventing system monitoring performed by Parsons Engineering Science, Inc. (Parsons ES) in October 1997 at Buildings 2034/2035 at Fairchild Air Force Base (AFB), Washington. Soil gas samples were collected and in situ respiration testing was performed by Parsons ES between 1 and 3 October 1997, to assess the extent of remediation completed during 1 year of full-scale air injection bioventing. The purpose of this letter is to summarize site remediation activities to date, present the results of the October 1997 system monitoring event and compare them with the results of the earlier pilot testing events, and to recommend future remediation activities for the site based on these findings.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 20, 1997
- Accession Number
- ADA385100
Entities
Organizations
- Parsons Corporation