Bioventing Pilot Test Work Plan for Building 735 Pumphouse, Grissom AFB, Indiana. Part 1. Draft Interim Pilot Test Results Report for Building 735 Pumphouse, Grissom AFB, Indiana. Part 2

Abstract

This work plan presents the scope of an in situ bioventing pilot test for treatment of fuel-contaminated soils at the Building 735 pumphouse at Grissom Air Force Base (AFB), Indiana. The pilot test has three primary objectives: 1) to assess the potential for supplying oxygen throughout the contaminated soil interval, 2) to determine the rate at which indigenous microorganisms will degrade fuel when stimulated by oxygen-rich soil gas, and 3) to evaluate the potential for sustaining these rates of biodegradation until fuel contamination is remediated to concentrations below regulatory standards.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1993
Accession Number
ADA385140

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Air Filters
  • Air Flow
  • Air Force
  • Air Force Facilities
  • Air Force Personnel
  • Carbon Dioxide
  • Chemical Synthesis
  • Chemistry
  • Contractors
  • Engineering
  • Environmental Pollutants
  • Groundwater
  • Hydrocarbons
  • Personal Protective Equipment
  • Protective Equipment
  • Test Methods
  • Volatile Organic Compounds

Readers

  • Environmental Remediation and Restoration.