Photolytic Destruction Technology Technical Memorandum, Environmental Management of Offgas Technology, Site S, Operable Unit D
Abstract
The existing well configuration and piping layout are presented in Figures A-i through A-3. Figure A-i shows the SVE pumps and well manifold connections. Figure A-2 shows the Site S wells and their respective manifolds and connection points to the air-water separators, blowers, and downstream offgas treatment equipment. From Figure A-2 it can be seen that all of the new wells (i.e., non-Site S wells) are manifolded together. This common header is connected to the manifold that receives the flow from all the deep wells from Site S. The combined flow from the new wells and Site S deep wells are routed through the larger air-water separator to the two 40-hp SVE vacuum pumps.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1996
- Accession Number
- ADA385143