Bioventing Test Work Plan for A-20 Radar Facility (Site SS-01) Hurlburt Field Fire Training Area (Site FT-39) Eglin Main Old Fire Training Area (Site FT-28)

Abstract

This test work plan presents the scope of an in situ bioventing pilot test for treatment of fuel contaminated soils at the A-20 Radar Facility (Site SS-0l), Hurlburt Fire training Area (Site FT-39) and Eglin Main Base Old Fire Training Area (Site FT-28) on Eglin Air Force Base (AFB), Florida. The pilot test has three primary objectives: 1) to assess the potential for supplying oxygen throughout the contaminated soil depth, 2) to determine the rate at which indigenous microorganisms will degrade fuel when stimulated by oxygen rich soil gas, 3) to evaluate the potential for sustaining these rates of biodegradation until fuel contamination is remediated below regulatory standards.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1993
Accession Number
ADA385153

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Accuracy
  • Air Force
  • Air Force Facilities
  • Construction
  • Drinking Water
  • Greenhouse Effect
  • Groundwater
  • Health Services
  • Hydrocarbon Fuels
  • Materials Laboratories
  • Materials Testing
  • Measurement
  • Medical Personnel
  • Personal Protective Equipment
  • Pressure Gages
  • Protective Equipment
  • Test And Evaluation

Fields of Study

  • Environmental science

Readers

  • Groundwater Contamination Remediation.