Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Intrinsic Remediation (Natural Attenuation) Option at the Former AGE Fuel Facility (Building 4715)
Abstract
This work plan, prepared by Parsons Engineering Science, Inc. (Parsons ES), presents the scope of work required for the collection of data necessary to conduct an engineering evaluation/cost analysis (EE/CA) for remediation of groundwater contaminated with petroleum products at the former Aerospace Ground Equipment (AGE) fueling facility adjacent to Building 4715 located at Seymour Johnson Air Force Base (AFB), Goldsboro, NC. This EE/CA will provide the framework for the site's Corrective Action Plan under the North Carolina requirements. Several remedial options will be evaluated during the EE/CA possibly including free product removal; groundwater extraction, treatment, and reinjection (i.e., pump and treat); air sparging; and natural contaminant attenuation (intrinsic remediation) with long-term monitoring. All hydrogeologic and groundwater chemical data necessary to evaluate the various remedial options will be collected under this program. However, this work plan is oriented toward the collection of hydrogeologic data to be used in support of intrinsic remediation for restoration of fuel-hydrocarbon-contaminated groundwater. When applicable, site-specific information may be obtained from previous studies conducted at Seymour Johnson AFB.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1995
- Accession Number
- ADA385175