Draft Interim Test Results Report for Bioventing Test Work Plan for Fire Training Pit 1 and Spill Site 1, F.E. Warren AFB, Wyoming

Abstract

Initial bioventing pilot tests were completed at two sites on F. E. Warren Air Force Base (AFB), Wyoming during the period of 8 to 26 June 1992. The purpose of Part II is to describe the results of the initial pilot tests at these sites and to make specific recommendations for extended testing to determine the long-term impact of bioventing on site contaminants. Descriptions of the history, geology, and contamination at Spill Site 1 (BX Service Station) and Fire Training Area 1 are contained in Part I, the Test Work Plan.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1992
Accession Number
ADA385180

Entities

Organizations

  • Parsons Corporation

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Ball Valves
  • Biodegradation
  • Boreholes
  • Chemical Synthesis
  • Chemistry
  • Concrete
  • Construction
  • Contamination
  • Engineering
  • Environmental Pollutants
  • Flow Rate
  • Groundwater
  • Monitoring
  • Steady State
  • Test Methods

Readers

  • Business Analytics
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Groundwater Contamination Remediation.