O&M Effort for the Bioventing System at the 7th Street BX Service Station (May 1992 through 1st Week in May 1993), Eglin, AFB

Abstract

Operation and maintenance (O&M) effort since installation of the bioventing system in May 1992 has included a check on each of the bioventing system components (i.e., blower, gauges, air filter, vapor extraction wells, and injection trenches) to evaluate operating status and to make adjustment where appropriate or necessary. The O&M effort also involved measurement of the following physical parameters: 1) Temperature at both blower suction and exhaust; 2) Vacuum at air filter; 3) Head loss through filter; and Pressure at Blower exhaust

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 18, 1993
Accession Number
ADA385609

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Air Filters
  • Air Flow
  • Air Force
  • Air Intakes
  • Biodegradation
  • Carbon Dioxide
  • Engineering
  • Filters
  • Greenhouse Effect
  • Groundwater
  • Hydrocarbons
  • Maintenance
  • Materials
  • Measurement
  • Monitoring
  • Relief Valves
  • Respiration

Fields of Study

  • Engineering

Readers

  • Combustion and Flow Dynamics.
  • Environmental Engineering.
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.