O&M Effort for the Bioventing System at the 7th Street BX Service Station (October through January 1993), Eglin, AFB

Abstract

Operation and maintenance (O&M) effort since installation of the bioventing system in May 1992 has included a check on each of the bioventing system components (i.e., blower, gauges, air filter, vapor extraction wells, and injection trenches) to evaluate operating status and to make adjustment where appropriate or necessary. The O&M effort also involved measurement of the following physical parameters: 1) Temperature at both blower suction and exhaust; 2) Vacuum at air filter; 3) Head loss through filter; and Pressure at Blower exhaust.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 11, 1993
Accession Number
ADA385616

Tags

Communities of Interest

  • Air Platforms
  • Autonomy
  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Air Filters
  • Air Flow
  • Air Force
  • Air Intakes
  • Biodegradation
  • Carbon Dioxide
  • Engineering
  • Environmental Restoration And Remediation
  • Filters
  • Fuels
  • Groundwater
  • Maintenance
  • Materials
  • Measurement
  • Monitoring
  • Relief Valves
  • Respiration

Fields of Study

  • Engineering

Readers

  • Environmental Remediation and Restoration.
  • Internal Combustion Engine (ICE) Technology.