PART 1: Bioventing Pilot Test Work Plan for Installation Restoration Program Site 3, Fire Training Area, Battle Creek ANGB, Michigan. PART II: Draft Interim Pilot Test Results Report for Installation Restoration Program Site 3, Fire Training Area, Battle Creek ANGB, Michigan

Abstract

This work plan presents the scope of an in situ bioventing pilot test for treatment of fuel-contaminated soils at Installation Restoration Program (IRP) Site 3, Fire Training Area (Site 3), at the Battle Creek Air National Guard Base (ANGB), Michigan. Engineering-Science, Inc. (ES) will perform the testing. The pilot test has three primary objectives: 1) to assess the potential for supplying oxygen throughout the contaminated soil depth, 2) to determine the rate at which indigenous microorganisms will degrade fuel when supplied with oxygen-rich soil gas, and 3) to evaluate the potential for sustaining these rates of biodegradation until fuel contamination is remediated to concentrations below regulatory standards.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1992
Accession Number
ADA385759

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Air Filters
  • Air Force
  • Alkenes
  • Carbon Dioxide
  • Chemical Synthesis
  • Chemistry
  • Construction
  • Engineering
  • Environmental Pollutants
  • Groundwater
  • Hydrocarbons
  • Installation Restoration
  • Monitoring
  • Organic Compounds
  • Steady State
  • Test Methods
  • Volatile Organic Compounds

Fields of Study

  • Environmental science

Readers

  • Environmental Remediation and Restoration.