Two-Phase Extraction (TPE) Pilot-Scale Test Technology Evaluation Report
Abstract
In August 1995, Nellis Air Force Base (AFB) and Radian Corporation (Radian) completed a five-day pilot treatability test at Site 44 using the Two-Phase Extraction (TPE) technology. This report provides a summary of the methodology used during the test, the test results, and base-specific recommendations.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1995
- Accession Number
- ADA386080