Critical Examination of C-130 Programmed Depot Maintenance (PDM) Induction Methodology: Determining PDM Intervals

Abstract

The current USAF process for establishing intervals between C-130 PDM does not account for the wide range of aircraft variables within each aircraft MDS. This paper develops a model, based on five unique aircraft variables, to provide C-130 maintainers with a prediction tool to forecast when a C-130 aircraft requires PDM. These five variables include: aircraft age, total flying hours, average yearly flying hours, mission profile (expressed as a severity factor), and operating location of the aircraft. Interviews with C-130 SPO personnel, combined with use of the C-130 Service Life Data Base, provided the required data to develop the C-130 PDM interval model. The C-130 PDM interval model developed in this paper allows maintainers and operators to predict the optimum time between C-130 PDM activities. It eliminates the requirement to base PDM intervals on aircraft MDS. As a result, there is a potential for significant savings by deferring PDM for a portion of the C-130 fleet. Finally, the PDM interval model developed in this paper may be applicable for other DOD aircraft which use aircraft MDS as the determinant of PDM intervals.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1997
Accession Number
ADA394056

Entities

People

  • John A. Daniels

Organizations

  • Air University

Tags

DTIC Thesaurus Topics

  • Abstracts
  • Aerospace Craft
  • Air Force
  • Air Force Aircraft
  • Aircraft Equipment
  • Aircrafts
  • Databases
  • Department Of Defense
  • Engineers
  • Logistics
  • Logistics Management
  • Maintenance
  • Management Personnel
  • Mission Profiles
  • Program Management
  • Structural Integrity
  • Training

Readers

  • Logistics and Supply Chain Management.
  • Regression Analysis.