Engineering and Design: Planning and Design of Temporary Cofferdams and Braced Excavations
Abstract
This regulation provides directives for procedures to be followed while planning and designing temporary construction for cofferdams and unwatered excavations on major civil works projects. The objective is to provide criteria and guidance for providing safe working conditions and life protection optimizing cost versus risk of damage maintaining navigation and securing the integrity of permanent structures during the use of temporary unwatered cofferdams and excavations on major civil works projects.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 31, 1994
- Accession Number
- ADA404093
Entities
Organizations
- United States Army Corps of Engineers