Engineering and Design: Post Completion Inspection and Design Criteria Feedback Inspection (RCS Exempt: AR 335-15, Paragraph 5-2e(6))

Abstract

This regulation provides the general policy and procedures for acquiring feedback information from field engineering and construction sources, and the processing and dissemination of the feedback information to appropriate levels of USACE Engineering and construction and MACOM.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 20, 1991
Accession Number
ADA404400

Entities

Organizations

  • United States Army Corps of Engineers

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Acquisition
  • Air Force
  • Army
  • Army Corps Of Engineers
  • Army Facilities
  • Construction
  • Design Criteria
  • Energy Systems
  • Engineering
  • Engineers
  • Feedback
  • Inspection
  • Lessons Learned
  • Materials
  • Regulations
  • Solar Energy
  • Standardization

Readers

  • Business Analytics
  • Instructional Design and Training Evaluation.
  • Logistics and Supply Chain Management.