Pine Flat Dam Fish and Wildlife Habitat Restoration, Fresno, California. Appendix C. Basis of Design and Cost Estimate Office Report

Abstract

The purpose of this Office Report (Basis of Design) is to present a feasibility level design and costs for: (1) a proposed multi-level intake structure at the upstream side of Pine Flat Dam; (2) purchase and restoration of a 143.5 acre parcel of land downstream of the dam near the Friant-Kern Canal and the Kings River (at Byrd Slough); and (3) a proposed 10.6 mile stretch of a water transfer pipeline that will carry water from Kings River northwest to the Mendota Pool. The first two design features are being developed by the Corps of Engineers, Sacramento District, while the local sponsor (Kings River Conservation District, (KRCD)) is performing in-kind work by the use of an engineering consultant on a water transfer pipeline.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 2001
Accession Number
ADA406461

Entities

Organizations

  • Sacramento District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Biomedical
  • Engineered Resilient Systems
  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Alkenes
  • Boundary Layer
  • Chemical Synthesis
  • Chemistry
  • Computational Fluid Dynamics
  • Drainage Basins
  • Environment
  • Environmental Protection
  • Fish
  • Groundwater
  • Health Services
  • Medical Personnel
  • Organic Chemistry
  • Three Dimensional
  • Waste Disposal Facilities
  • Water Resources

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering