Pine Flat Dam Fish and Wildlife Habitat Restoration, Fresno, California. Appendix C. Basis of Design and Cost Estimate Office Report
Abstract
The purpose of this Office Report (Basis of Design) is to present a feasibility level design and costs for: (1) a proposed multi-level intake structure at the upstream side of Pine Flat Dam; (2) purchase and restoration of a 143.5 acre parcel of land downstream of the dam near the Friant-Kern Canal and the Kings River (at Byrd Slough); and (3) a proposed 10.6 mile stretch of a water transfer pipeline that will carry water from Kings River northwest to the Mendota Pool. The first two design features are being developed by the Corps of Engineers, Sacramento District, while the local sponsor (Kings River Conservation District, (KRCD)) is performing in-kind work by the use of an engineering consultant on a water transfer pipeline.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 2001
- Accession Number
- ADA406461
Entities
Organizations
- Sacramento District, U.S. Army Corps of Engineers