Rapid Runway Repair Test Description
Abstract
This report describes instrumentation used during Rapid Runway Repair (RRR) tests with a C-141B and C-5A at RAF Wethersfield during October 1-21, 1985. The RRR test objectives were to validate the Precast Concrete Slab (PCS) and Fiberglass Mat (FGM) repairs for use with strategic airlift aircraft, to collect data on the performance of the two repair types under sustained airlift trafficking, to determine necessary modifications to the repair methods to support sustained airlift aircraft operations, and to provide additional data for the (TAXIG) HAVE BOUNCE Program.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1985
- Accession Number
- ADA408243
Entities
People
- David Banaszak
- Earl Rogers
Organizations
- Flight Dynamics Laboratory