Analysis of Movement Requirements for Unit Equipment

Abstract

This project focused on developing a methodology to conduct a deployment analysis at the line item number (LIN) level. Analysis could be done for future projects looking at the type of equipment required for deployment. The project used the results of the Total Army Analysis - 2007 (TAA-07) base case as a test bed for the prototype developed in this project. The process is very flexible and uses Access and Excel for its execution and output display.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 2000
Accession Number
ADA411391

Entities

People

  • Giles D. Mills Iii

Tags

Communities of Interest

  • Air Platforms
  • Materials and Manufacturing Processes
  • Weapons Technologies

DTIC Thesaurus Topics

  • Abstracts
  • Aircrafts
  • Artillery
  • Combat Vehicles
  • Deployment
  • Engineers
  • Fixed Wing Aircraft
  • Generators
  • Ground Vehicles
  • Helicopters
  • Military History
  • Models
  • Prototypes
  • Standards
  • Test Beds
  • Vehicles
  • Warfare

Readers

  • Database Systems and Applications
  • Software Engineering
  • Theoretical Analysis.