Coppei Creek Flood Control Project Waitsburg, Washington. Detailed Project Report and Environmental Assessment
Abstract
The purpose of this Detailed Project Report and Environmental Assessment is to identify and evaluate alternatives and select a preferred alternative for flood reduction and Coppei Creek Bridge 12 / 666 replacement in the City of Waitsburg. The feasibility level Detailed Project Report and Environmental Assessment provides a complete presentation of study results and findings based on engineering, economic, social, and environmental criteria.
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 01, 2002
- Accession Number
- ADA411526
Entities
Organizations
- United States Army Corps of Engineers