Dredged Material Management Plan and Environmental Impact Statement. McNary Reservoir and Lower Snake River Reservoirs. Appendix A: Hydrologic Analysis

Abstract

This Final Dredged Material Management Plan/Environmental Impact Statement (DMMP(EIS) presents the Corps of Engineers programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the lower Snake River reservoirs between Lewiston, Idaho and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In_water Disposal; Alternative 2 - Maintenance Dredging With In_water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - maintenance Dredging With Upland Disposal and a 3-Foot Levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 2002
Accession Number
ADA412287

Entities

Organizations

  • United States Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Army Corps Of Engineers
  • Drainage Basins
  • Dredging
  • Engineering
  • Engineers
  • Environment
  • Environmental Protection
  • Flood Control
  • Floods
  • Geography
  • Materials
  • Sedimentation
  • Topography
  • United States
  • Water Resources
  • Water Supplies
  • Waterways

Fields of Study

  • Environmental science

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering